Interested in a PLAGIARISM-FREE paper based on these particular instructions?...with 100% confidentiality?

Order Now

Scenario, Design a project, upgrading field technician (Computer Repair & Networking) upgrading from using paper work orders to Smartphone and Pads to communicate completed jobs during their route each day and add more out in the field services that a Smartphone and Pads can support. At a minimum this section will contain the following: Allocation of resources to project tasks (both labor and material) Cost estimates for project resources Gantt diagram showing duration estimates for all tasks and their sequencing (including precedence relations) and highlighting any critical path(s) arising from task dependencies ultimately determining the minimal duration of a project In addition summarize any relevant facts about the project duration, number or type of resources, critical task sequencing, or how duration estimates were arrived at, and any financial implications (for example, budget or cost reports of the project as well) Develop a baseline for your project plan so that all future variances are captured. Write 3 to 4 pages on your findings.

Scenario,
Design a project, upgrading field technician (Computer Repair & Networking) upgrading from using paper work orders to Smartphone and Pads to communicate completed jobs during their route each day and add more out in the field services that a Smartphone and Pads can support.


At a minimum this section will contain the following: 

Allocation of resources to project tasks (both labor and material)
Cost estimates for project resources
Gantt diagram showing duration estimates for all tasks and their sequencing (including precedence relations) and highlighting any critical path(s) arising from task dependencies ultimately determining the minimal duration of a project 

In addition summarize any relevant facts about the project duration, number or type of resources, critical task sequencing, or how duration estimates were arrived at, and any financial implications (for example, budget or cost reports of the project as well) 

Develop a baseline for your project plan so that all future variances are captured.

Write 3 to 4 pages on your findings.

Interested in a PLAGIARISM-FREE paper based on these particular instructions?...with 100% confidentiality?

Order Now